Smooth engineering – Xining this year to open up 9 broken road

Smooth engineering – Xining this year to open up 9 broken road

Xining city this year will continue to open up some broken road project.

it is understood that open up the broken road project by the Municipal Planning Bureau in accordance with the requirements of improving regional road network structure, organization of 28 broken road, through on-site inspection, to meet the conditions to determine the current open east, West Jia Xiaoxiang, Xing Hai Lu Tianju east side of the hotel 2 Planning Road, Riverside Road, riverside (Beichuan River) Bei Lu (Huang Shuihe), planning of Road (Ledu road – Republic Road), the International Village Primary School South Road (South Street – Ledu Road), Yongteng Road 9 broken road. Among them, Xing Hai Lu Dong Duan plan on the existing road reconstruction, and cross the bridge connecting the Nanchuan river is being built and connected to the Datong Street, after the completion of the project will effectively alleviate the Yangtze River Road and Changjiang Road Bridge, 54 bridge with seven traffic lanes of the road pressure; Jia Jia alley by market, vehicle not normal traffic, west district government plans to invest 50 million yuan will be relocated to the west side of Kunlun existing booth sunshine city residential shops, on the existing road reconstruction, security vehicles to navigate, alleviate the northern section of the West Kunlun Road, Nanchuan road traffic pressure; the east side of the hotel I Tianju planning north from Qilian Road, South Riverside Road Planning, the total length of 202 meters, width 12 meters, the main construction contents for the roadway pavement, such as the east side of the hotel; Tianju Planning II northbound Qilian Road, South to the coast of Hebei The road, planning a total length of 201 meters, width 9 meters, the main construction contents for sidewalk, roadway; Riverside Road North Tianjin Road, South happiness lane, a total length of 650 meters, width 15 meters after the completion of planning, will increase the north area of North and South connecting line, alleviate traffic pressure on Bridge Street; Riverside Road (West Huang Shuihe) a bridge, the five East Bridge, a total length of 1500 meters, width 12 meters planning; planning of Road East of South Road, west of Ledu Road, a total length of 340 meters, width 12 meters after the completion of planning, will further improve the road network, effectively alleviate the traffic pressure of Kunlun Avenue and Nanshan Road; the International Village Primary School South Road West of the South Court Street, East Ledu road international village primary school gate, planning a total length of 293 meters, width of 22 meters; Yongteng Road south from north to East Main Street, North Street, a total length of 245 meters, width 14 meters planning. (author: Zhao Linsong)
 

Leave a Reply

Your email address will not be published. Required fields are marked *